IAW East River Station Residual Improvements
Davenport, IA
Client: Iowa American Water Company
Designer: HDR, Inc.
Contract Amount: $2,250,000
Delivery Method: General Contracting
Summary:
In this project, we were tasked with renovating two existing sludge removal tanks and installing new sludge removal equipment. The renovation included:
- Demolition: Removal of the existing sludge collection system.
- Concrete Work: Installation of cast-in-place concrete walls to square the tanks.
- New Systems: Installation of a new sludge collection and pumping system.
- Baffle Walls: Installation of geo-membrane baffle walls.
- Electrical Work: Associated electrical work, equipment controls, and structural aluminum framing.
The project was completed in two phases, with each tank being addressed in a separate phase.